Street Excavation Permits

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Any excavation within the City’s street right-of-way requires a “Permit to Excavate in the Public Right-of-Way (ROW).” The City’s right-of-way generally extends from sidewalk to sidewalk, including the sidewalks themselves. The permit must be obtained a minimum of 48 hours prior to commencing work. The field representative must have a copy of the approved permit on site at all times. 

Types of Excavation Permits:

  • Utility Construction (Electric/Telephone/Fiber/Cable TV, Utility Pole/Street Light, Gas, Sanitary, Storm, Water, Hydrants)
  • Sidewalks
  • Driveway Apron 
  • Curb Cut
  • Private Driveway (staking only)
  • Landscaping

A Cement Finisher License is also required to construct or repair any concrete walk, curb and gutter, driveway or pavement in any public right-of-way.

  1. Street Excavation Permit Form
  2. Submit a Sketch or Site Plan: Provide a detailed sketch or site plan for the proposed work.
  3. Submit Insurance: Provide a Certificate of Insurance (COI) listing the City of Appleton as an additional insured. 
  4. Submit ROW Permit Bond Form

 Online Payments: Street Excavation Fee

This form should then be e-mailed along with a sketch in pdf format to the following: David.Strelcheck@AppletonWI.gov, Luke.Vandenberg@AppletonWI.gov and Mark.Lahay@Appleton.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer