Street Occupancy Permits

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

TEMPORARY AND PERMANENT STREET OCCUPANCY PERMITS

The City of Appleton requires permits for all activities within the public right-of-way(ROW). This includes any work that involves occupying or obstructing the right-of-way. The permit ensures that all work is conducted in accordance with the City of Appleton’s standard specifications, helping to protect public infrastructure, minimize disruptions to the community, and ensure that any disturbed areas are restored to their original or an improved condition.

Important: Work must not commence until all necessary permits have been approved and issued by the City of Appleton Public Works Department. 

Permit application requirements:

  1. Street Occupancy Permit Form
  2. Statement of Insurance Coverage
  3. Meter Bag Application: If a parking meter is located within this area; see metered street parking map.
  4. A traffic control plan must be submitted, for lane of traffic (or sidewalk) closure or obstruction for any length of time,  to the Traffic Engineer prior to the permit being issued. Click here to contact us.

Payment and Submittal Information:
Payment can be made (non-refundable fee): Online: Pay Occupancy Fee

Submit all permit applications, supporting documents, and payment confirmation number via email: customer.service@appleton.org

 Permit applications are processed in the order they are received. Please allow up to five (5) full business days for the approval of your permit.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer